Just a quick update on the kitchen work this weekend. We had to take back one box of broken floor tiles and ended up picking up two more extra boxes just in case in preparation for the floor tiling next month.
I also reworked the doorway btwn the living room and kitchen; I had to rip open one side when we got our new refrigerator since the opening wasn’t wide enough, even after removing the refer doors. The original opening was only 29” wide; I hope to get it to 31.5” wide once I am done retriming the doorway.
I also replaced three sections of the cabinet facing that was damaged during the new countertop installation. I also made and installed a pull out drawer below the kitchen sink. And I installed a cove moulding underneath the countertop and started installing the new tiles above the backsplash. We now wish we had just had the granite backsplash built high enough so the tiles wouldn’t be necessary but oh well. I have to go to buy a tile cutter so I can start working around the window casing. Enjoy!





| Blog entry by 3fingerpat | posted 101 days ago | 322 reads | 0 times favorited | 2 comments | ![]() |
| « Part 1: Kitchen Remodel | Part 2 of Kitchen remodel series | Part 3: One step forward, two steps back » |
Your Online Home - Your Support Is Greatly Appreciated - Your Showcase - 3 Ways To Help, Financially - Your Community




















2 comments so far
Damocles
home | projects | blog
35 posts in 231 days
posted 100 days ago
Lookin’ great, Pat! I dig the backsplash…
-- Proud to be an addicted LJ, GT and HR!
PaBull
home | projects | blog
265 posts in 178 days
posted 99 days ago
You got a lot of work done in a short amount of time. Thanks for the update.
-- http://www.twinoaksgrowers.com